Skip to content

 

The 2025 Water Quality Consumer Confidence Reports are now available.

These extensive reports are published, in accordance with EPA and PA DEP guidelines annually for all our water systems and can be found here.

 

Lake Williams Dam Project

Drilling & Grouting

Construction workers at the Lake Williams Dam mixing concrete.

Anchors are drilled and grouted into bedrock along the dam’s downstream right abutment area. Following strength testing, slabs will be poured to reinforce the area in order to protect the dam and embankment during future major storm events.

Back to News & Updates