Bedrock Has Been Drilled
![Construction site at the Lake Williams Dam construction.](https://www.yorkwater.com/wp-content/uploads/January-11-2023-e1699026913478.png)
The spillway’s bedrock has been drilled and anchors have been installed for the Plinth structure that was formed and poured with concrete. At the same time, the spillway’s right transitional gravity wall has been constructed with Roller Compacted Concrete (RCC). Preparations are currently underway on the Dam’s crest for work.