Skip to content

 

Temps are low! Proper insulation and/or emptying of water pipes that are in unheated parts of your home, including basements, attics, garages, and crawl spaces, can freeze quickly. For more winter weather preparation tips, visit our Customer Education page

 

The 2025 Water Quality Consumer Confidence Reports are now available.

These extensive reports are published, in accordance with EPA and PA DEP guidelines annually for all our water systems and can be found here.

 

RATE REQUEST FILING. Learn more here.

 

Lake Williams Dam Project

Valve Tower’s Top Deck Formwork

Construction work at the Lake Williams Dam.

A new blend of Roller Compacted Concrete (RCC) is being placed on the new spillway right training wall. Simultaneously, in the background on the right, inclined anchors are being drilled into bedrock for the non-overflow wall section. On the left side of the photo, another crew is working on the valve tower’s top deck formwork.

Back to News & Updates