Skip to content

 

Temps are low! Proper insulation and/or emptying of water pipes that are in unheated parts of your home, including basements, attics, garages, and crawl spaces, can freeze quickly. For more winter weather preparation tips, visit our Customer Education page

 

The 2025 Water Quality Consumer Confidence Reports are now available.

These extensive reports are published, in accordance with EPA and PA DEP guidelines annually for all our water systems and can be found here.

 

RATE REQUEST FILING. Learn more here.

 

Lake Williams Dam Project

Weathered Bedrock

The spillway’s fill material has been mostly removed, exposing the top of weathered bedrock. Work continues on removing sections of Water Street over the top of the dam.
An operator is using a remote unit to control a Sonic drill unit to penetrate the very dense rock at Lake Williams to install a dewatering system around the construction zone.

The spillway’s fill material has been mostly removed, exposing the top of weathered bedrock. Work continues on removing sections of Water Street over the top of the dam. An operator is using a remote unit to control a Sonic drill unit to penetrate the very dense rock at Lake Williams to install a dewatering system around the construction zone.

Back to News & Updates